Vivant Posts 42% Rise In Core Net Income To PHP318M In 1Q2025 On Strong Power, DU Gains

Consolidated Core Net Income (CCNI) grew by 42% to Php 318 mn; accounting for non-recurring income, Net Income Attributable to Equity Holders of the Parent recorded at Php 284 bn, 26% higher than the level in 1Q 2024.

A Break In The Script: What The 2025 Midterm Elections Reveal About The Pinoy Voters

The 2025 elections serve as a reminder that political power is not a birthright. The Filipino voter today demands accountability and authenticity, suggesting a pivotal moment in our governance narrative. Are our leaders equipped to face this new chapter?

Iloilo City Launches 1st LGU-Led Nutrition Hub For Kids, Moms

Ang Uswag Nutrition Center ng Iloilo City ay isang mahalagang hakbang sa pagbibigay ng masustansyang pagkain para sa mga bata at mga buntis na ina.

NHA Sees Completion Of Post-Yolanda Houses By December

Inaasahan ng NHA na matatapos na ang mga bahay para sa mga biktima ng Yolanda sa Disyembre 2025, pagkatapos ng mahigit isang dekada ng paggawa.

DPWH To Build Another Leyte-Biliran Link Bridge

The DPWH will build a PHP500-million bridge parallel to the deteriorating Biliran Bridge that connects the island province to Leyte Island.

DPWH To Build Another Leyte-Biliran Link Bridge

0
0

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

The Department of Public Works and Highways (DPWH) will build a PHP500-million bridge parallel to the deteriorating Biliran Bridge that connects the island province to Leyte Island.

DPWH Biliran district engineering office chief Ferdinand Briones on Thursday said the proposed bridge will be constructed next to the existing old Biliran Bridge. The old bridge designed and built in 1976, can no longer be used by heavy vehicles.

“The redundant structure such as parallel or twin bridge will not only provide an alternate route but also augment the carrying capacity by effectively adding more tonnage and lanes for traffic,” Briones said in a statement.

The PHP500-million outlay for the new bridge is already included in the 2022 regular budget.

The Bridges Management Cluster – Unified Project Management Office of DPWH main office has already conducted site validation of the proposed bridge on March 25.

The Biliran Bridge is considered a major link of the province not only to nearby Leyte but to other parts of the country as well. (PNA)