Kadiwa Institutionalization In Iloilo City To Ensure Aid For Farmers

Ang institutionalization ng Kadiwa Program ay naglalayong magsulong ng mas magandang kinabukasan para sa mga magsasaka at komunidad sa Iloilo City.

Pag-IBIG Fund Seeks Barangay Officials’ Membership Contributions

Nais ng Pag-IBIG Fund na makuha ang suporta ng barangay sa mga kontribusyon ng mga village officials. Sama-sama para sa kaunlaran.

DepEd To Renew, Hire Over 7K Admin Support Staff

Magsisimula na ang DepEd sa pag-hire ng mahigit 7,000 administrative staff sa mga pampublikong paaralan sa bansa.

Commission Calls For Stronger Policies To Bridge Gender Gaps

Sa Buwan ng Kababaihan, nag-aanyaya ang CPD ng mga hakbang upang masolusyunan ang gender gap sa empleyo at serbisyong pangkalusugan.

Laoag Solar Lights Installation Set To Be Completed By December

Ilocos Norte's first district representative, Sandro Marcos, disclosed that his project on solar-powered street lights will be completed by December.
By The Visayas Journal

Laoag Solar Lights Installation Set To Be Completed By December

0
0

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

Motorists passing through the Laoag bypass road can expect a well-lit passage ahead as more solar-powered street lights are installed here to reduce traffic accidents.

The installation of solar street lights was among the campaign pledges of Ilocos Norte 1st District Rep. Ferdinand Alexander “Sandro” Marcos during the last elections.

“It has already started and my deadline is December,” Marcos said on Monday.

The lights will cover the whole stretch of the bypass road, including the 7.99-kilometer road opening, embankment, slope protection, and drainage from Barangay Buyon in Bacarra town to Barangay Bengcag along Rotonda in the city.

Aside from the installation of solar-powered lights on the dimly-lit highway, the Ilocos Norte police have also recommended putting up more road signs to avoid fatal vehicular accidents in the area.

To decongest traffic and promote sustainable transport like biking in downtown Laoag, the city government is also working on the rehabilitation and expansion of its road network as well as the lighting system of its 80 Barangays.

It is also planning to build a 804.9-meter bridge with 655-meter approaches. (PNA)